September 12, 2025 – Closure at Col Rowe Blvd and I-2 Intersection Extended

McALLEN – The closure at Col Rowe Boulevard and the I-2 westbound frontage road has been extended and will remain in place through Wednesday, September 17.

During this closure, westbound I-2 traffic will be detoured to continue west to 10th Street and follow a guided detour route. 

Southbound Col Rowe Boulevard traffic will be diverted to continue south on 2nd Street and follow directional signage through the 
alternate route.

Motorists are advised to allow extra travel time and follow posted detour signs.

September 12, 2025 – Closure at Col Rowe Blvd and I-2 Intersection Extended


Drivers are reminded to stay alert and slowdown in roadwork zones, to be aware of lane closures and alternate routes, and to follow all traffic control updates.

View safe driving practices at https://www.txdot.gov/driver/share-road/be-safe-drive-smart.html

Read more

August 11, 2025 – Nightly underpass closures in McAllen

PHARR – The I-2 underpasses at Jackson Road and Jackson Avenue in McAllen, will be intermittently closed nighty this week, August 4 through August 18. Crews will be painting structures in the area between 8 p.m. and 6 a.m. Detour signs will be in place to direct motorists through alternate routes.


In addition, daily and nighty lane reductions will continue through Pharr, McAllen, and San Juan for construction activities related to the I-2 / I-69C Interchange project. Entrance and exit ramps within these limits may be closed while work is in progress.

August 11, 2025 – Nightly underpass closures in McAllen


Drivers are reminded to stay alert and slowdown in roadwork zones, to be aware of lane closures and alternate routes, and to follow all traffic control updates.

View safe driving practices at https://www.txdot.gov/driver/share-road/be-safe-drive-smart.html

Read more

July 21, 2025 – Closures announced for the I-2 / I-69C Interchange Project

PHARR – Daily and nightly lane reductions are scheduled to continue this week, July 21 through July 27, throughout the project corridor. The closures are necessary to provide crews with a safe work zone. 


Details on nightly full roadway closures taking place this week are included below.


Nightly Closures

The following roadways will be closed nightly from 8PM to 6AM:

  1. Eastbound I-2 frontage road between Cage Boulevard and Veterans Boulevard in Pharr 
  2. Westbound I-2 frontage road between Cage Boulevard and Sugar Road in Pharr
  3. U.S. Business 83 underpass at I-2 in Pharr
  4. Westbound I-2 frontage road between Jackson Road and Jackson Avenue in McAllen

Entrance and exit ramps through McAllen, Pharr and San Juan may be intermittently closed while work is taking place. 


All work is weather permitting.


July 21, 2025 – Closures announced for the I-2 / I-69C Interchange Project


Drivers are reminded to stay alert and slowdown in roadwork zones, to be aware of lane closures and alternate routes, and to follow all traffic control updates.

View safe driving practices at https://www.txdot.gov/driver/share-road/be-safe-drive-smart.html

Read more

June 30, 2025 – Roadway closures for the I-2 /I-69C Interchange Project

PHARR – Details on closures taking

place this week, June 30 through July 6, for the I-2 / I-69C Interchange

Project are included below.


Daily Closures

The following exit ramps will be closed daily this week between

8:30AM and 4PM:

  1.  Westbound I-2 Raul Longoria Road

    exit ramp, in San Juan

  2.  Westbound I-2 Cage Boulevard

    exit ramp, in Pharr

Nightly Closures

The following roadways will be closed nightly this week, from

8PM to 6AM:

  1.   U.S. Business 83 underpass at

    I-2, in Pharr

  2.   Eastbound I-2 McColl Road exit

    ramp, in McAllen

  3.  Eastbound I-2 Jackson Road exit

    ramp, in McAllen

  4.  Westbound I-2 frontage road

    between Jackson Road and Jackson Avenue, in McAllen

Daily and nightly lane reductions will continue throughout the project

corridor to provide crews with a safe work zone.

June 30, 2025 – Roadway closures for the I-2 /I-69C Interchange Project


Drivers are reminded to stay alert and slowdown in roadwork zones, to be aware of lane closures and alternate routes, and to follow all traffic control updates.

View safe driving practices at https://www.txdot.gov/driver/share-road/be-safe-drive-smart.html

Read more

June 23, 2025 – Details on the closures for the I-2 / I-69C Interchange Project

PHARR – Roadway closures taking place this week, June 23 through June 29, for the I-2 /I-69C Interchange Project are included below.

Continuous Closures
The following roadways will be continuously closed this week:
  1. Eastbound I-2 Sugar Road exit ramp, in Pharr
  2. Turnaround lanes, in both directions, at McColl Road, in McAllen
Nightly Closures
Nightly full closures will take place from 8PM to 6AM at the following locations: 
  1. U.S. Business 83 underpasses at I-2, in Pharr
  2. Westbound I-2 frontage road between Jackson Road and Jackson Avenue, in McAllen
  3. Eastbound I-2 entrance and exit ramps between Jackson Road and Jackson Avenue, in McAllen
Daily closures:
Daily ramp closures will be in place between 8:30AM and 4PM at the following locations:
  1. Westbound I-2 Cage Boulevard exit ramp, in Pharr
  2. Eastbound I-2 Cesar Chavez Road exit ramp, in San Juan
Daily and nightly lane reductions will also be in place throughout the project corridor to provide crews with a safe work zone. 

All work is weather permitting.

June 23, 2025 – Details on the closures for the I-2 / I-69C Interchange Project


Drivers are reminded to stay alert and slowdown in roadwork zones, to be aware of lane closures and alternate routes, and to follow all traffic control updates.

View safe driving practices at https://www.txdot.gov/driver/share-road/be-safe-drive-smart.html

Read more

June 16, 2025 – Closures announced for the I-2 / I-69C Interchange Project

PHARR – Details on closures taking place this week, June 16 through June 22, for the I-2 / I-69C Interchange Project are included below.

Nightly Closures
The following roadways will be closed nightly, from 8PM to 6AM:
  1. Westbound I-2 frontage road between Veterans Boulevard and Cage Boulevard, in Pharr
  2. Westbound I-2 frontage road between Jackson Road and Jackson Avenue, in McAllen
  3. U.S. Business 83 underpass at I-2, in Pharr
Continuous Closures
Starting Monday night, June 16, the following roadways will be continuously closed for the week:
  1. Westbound I-2 Sugar Road/ Jackson Road exit ramp, in Pharr 
  2. I-69C turnaround lanes, in both directions, at Sioux Road, in Pharr 
  3. I-69C turnaround lanes, in both directions, at McColl Road, in McAllen
Daily and nightly lane reductions will also continue along the frontage roads and main lanes, throughout the project corridor, to provide crews with a safe work zone. The entrance and exit ramp may be intermittently closed while work is taking place. 

June 16, 2025 – Closures announced for the I-2 / I-69C Interchange Project


Drivers are reminded to stay alert and slowdown in roadwork zones, to be aware of lane closures and alternate routes, and to follow all traffic control updates.

View safe driving practices at https://www.txdot.gov/driver/share-road/be-safe-drive-smart.html

Read more

Design Activities

The following design activities are currently taking place:

  • Direct Connector 4 (DC-4) design
  • Frontage road design
  • Utility design

Maintenance Activities

The following maintenance activities are currently taking place:

  • Project maintenance inspections